After-sales Service: | Online |
---|---|
Warranty: | Online |
Standard: | ASTM, JIS, GB, AISI, DIN, BS |
Certification: | ISO, RoHS, IBR |
Surface Treatment: | Milled Surface |
Technique: | Cold Rolled/Hot Rolled |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Factory Direct QC Adapted Q235B Q345I S235jr Ss400b St37 St52 1010 Carbon Steel Coil ASTM A36 Hot Rolled Steel Coil Ms Coil Mild Carbon Steel for Construction
Certificates | API5L ISO 9001:2008 TUV SGS BV etc | Products | Carbon Steel Coil |
Edge | Mill Edge / Slit Edge | Material | Q235B, A36, Q195, SS400, st37-2, etc. |
Grade | ASTM A36 ST37, etc. | Standard | ASTM/EN/JIS/GB/etc. |
Mill Test Certificate | Available | Thickness | 6-400mm |
Surface | Black painting, Varnish painting, Anti-rust oil, Hot galvanized, cold galvanized, 3PE | Width | 800mm-330mm (914mm,1215mm,1250mm,1000mm the most common) or customized |
Packing | Standard Packaging | Stock or not | Stock |
Payment terms | L/C T/T (30%DEPOSIT) | Coil Weight | 3-10 MT |
Application | Construction, Shipbuilding, Machinery manufacturing, Steel structure, etc. | Coil Inner size | 508mm/610mm or customized |
1. Are1 you a manufacturer?
A:Yes, we are manufacturers. We have our own factory and our own company. I believe we will be the most suitable supplier for you.
2. Q: Do you have quality control system?
A: Yes, we have ISO, BV, MTC, certifications and our own quality control laboratory.Third party testing services are also available.
3. Q: Can we visit your factory?
A: Sure, we welcome you to visit our factory , check our production lines and know more about our strength and quality.
4. Q: Can I get some samples?
A: We are glad to provide free samples to you, but we do not offer the freight.
5. Q: What is your MOQ?
A: 1 Tons
6. Q: Can you arrange the shipment for us?
A: Yes, we have designated sea freight and railway freight forwarders with decades of experiences and we get the best price with earlist vessel and professional service.
7. Q: How long is your delivery time?
A: Generally it is 7days if we have the exact goods in our stock. If not, it will take around 15-20 days to get goods ready for delivery.
Suppliers with verified business licenses